The project involves the construction of the new Mineral Oil dock in the Port of Genoa through the reshaping of the existing quay.
The intervention aims to enhance navigation safety within the maneuvering channel and mooring for nautical vessels (small boats, Bulk Carriers with LOA 130 m) operating in the dock. Thanks to the new layout of the Mineral Oil dock, the access channel to the quay will be expanded by more than 40 meters, and the mooring points will be doubled. The presence of a fixed structure, such as a pier, is ensured to protect the internal activities of the dock from all passing ships.
The project involves the construction of the new Mineral Oil dock in the Port of Genoa through the reshaping of the existing quay.
The intervention aims to enhance navigation safety within the maneuvering channel and mooring for nautical vessels (small boats, Bulk Carriers with LOA 130 m) operating in the dock. Thanks to the new layout of the Mineral Oil dock, the access channel to the quay will be expanded by more than 40 meters, and the mooring points will be doubled. The presence of a fixed structure, such as a pier, is ensured to protect the internal activities of the dock from all passing ships.