The works for the construction of the harbour of Bagnara Calabra carried out by the Cooperative “Works for the Bagnara Calabra harbour” include:
- the construction of the access viaduct to the harbour areas;
- the construction of the water-break by using cellular cassions having the following dimensions: 21×17,40×17;
- the construction of the shore dock with dock rocks and reflecting elements;
- the construction of the under-billow pier with reef core and series of tetrapodes of 25 tons each