Visit by the CEO of Eni Rewind Dr. Paolo GROSSI at the MISP shipyard in the areas outside the Brindisi Petrochemical Plant – MICOROSA. The permanent safety of the MICOROSA landfill involves the construction of a belt with a watertight barrier of areas covering approximately 55 hectares, carried out by means of a plastic diaphragm with an interclosed HDPE sheet and Jet Grouting to overcome interference and clamping with existing works.
The project includes hydraulic engineering works (“panda and Gronda canals”), extraction wells with groundwater transfer to the TAF plant, forest engineering works, with very high environmental and quality standards, in line with the customer’s policy and with the objectives prescribed by the Ministry of the Environment.
The last interference with the power line and gas pipeline, both in operation (Terna and SnamRete Gas), is being resolved using the jet grouting technique with particular caution and tolerances of only 1 mm on the vibrations induced on the gas pipeline detected with electrolines.
genoa
breakwater
pizzoli marisabella
bari
la spezia
cruise dock
dredging
caissons
dredge
brindisi
motore italia
venezia pontoon
italian competition authority
female sailor
adherence to regulations
sestri ponente
rating for legal compliance
Port of Catania
dry docks
top ligurian companies
catania
ship repair
genova pra’
benedetta
mineral oils
viaduct
floating dock
training courses for construction workers
first caisson
oopp superintendency
inclusion
ponte dei mille levante
study
extraordinary reception centers
vado ligure
ance genoa
deep basin
jet grouting
liguria region
capobianco
eni
municipality of genoa
manfredonia
micorosa
genovese school of building