The rock dredging, backflow and accommodation in the Marisabella fill tank in the Port of Bari have entered the phase of full activity.
The activities are carried out through the use of the CSD dredge Willem van Rubroeck which started the activities on 20.05.2022.
Fincosit had the honor of having the visit of the Commander of the Bari Maritime Directorate Rear Admiral Vincenzo LEONE, the President of the Port System Authority of the Southern Adriatic Sea Prof. Ugo PATRONI GRIFFI and of the Secretary General Tito VESPASIANI, who have made the maximum institutional effort to allow the fundamental dredging activity, preparatory both, for the completion of the works in the Pizzoli_Marisabella areas and for the future development of the port of Bari.
adherence to regulations
ance genoa
bari
benedetta
breakwater
brindisi
caissons
capobianco
catania
cruise dock
deep basin
dredge
dredging
eni
extraordinary reception centers
female sailor
first caisson
floating dock
genoa
genovese school of building
inclusion
italian competition authority
jet grouting
la spezia
liguria region
manfredonia
micorosa
mineral oils
motore italia
municipality of genoa
oopp superintendency
pizzoli marisabella
ponte dei mille levante
port of bari
Port of Catania
rating for legal compliance
sestri ponente
study
top ligurian companies
training courses for construction workers
training for employment
vado ligure
venezia pontoon