The rock dredging, backflow and accommodation in the Marisabella fill tank in the Port of Bari have entered the phase of full activity.
The activities are carried out through the use of the CSD dredge Willem van Rubroeck which started the activities on 20.05.2022.
Fincosit had the honor of having the visit of the Commander of the Bari Maritime Directorate Rear Admiral Vincenzo LEONE, the President of the Port System Authority of the Southern Adriatic Sea Prof. Ugo PATRONI GRIFFI and of the Secretary General Tito VESPASIANI, who have made the maximum institutional effort to allow the fundamental dredging activity, preparatory both, for the completion of the works in the Pizzoli_Marisabella areas and for the future development of the port of Bari.
genoa
breakwater
port of bari
pizzoli marisabella
bari
cruise dock
la spezia
brindisi
dredging
caissons
dredge
micorosa
genovese school of building
training for employment
motore italia
venezia pontoon
italian competition authority
female sailor
adherence to regulations
sestri ponente
rating for legal compliance
Port of Catania
dry docks
top ligurian companies
catania
ship repair
genova pra’
benedetta
mineral oils
viaduct
floating dock
training courses for construction workers
first caisson
oopp superintendency
inclusion
ponte dei mille levante
study
extraordinary reception centers
vado ligure
ance genoa
deep basin
jet grouting
liguria region
capobianco
eni



























